logo.gif (1985 bytes) ED LAU IRONWORKS LIMITED

STEEL STAIRS AND RAILINGS

STRUCTURAL STEEL

MISCELLANEOUS METAL FABRICATIONS

 

Up St. Benedict School Corvex Manufacturing Seagram Lofts

 

StBenedict.jpg (127812 bytes) St. Benedict Catholic Secondary School, Cambridge, Ontario

Owner / Developer: Buttcon Limited
Tennant:  Waterloo Region Roman Catholic Separate School Board
Architect:  C.A. Ventin Architect Limited

This three storey school and library, opened in the fall of 1997, encompasses a building area of 7,800 square metres (84,000 sq. ft.).  The atrium at the main entrance to the school features a circular concrete staircase with steel railings and stainless steel handrail.  At the second floor level, the railing continues around the circumference of the atrium area.

In addition to these railings, our contract included several steel pan stairs with steel railings, ladders, catwalk framing, supports for operable partition walls and goal posts for the playing fields.

CWB ED LAU IRONWORKS CISC

Last updated 03/08/05